
How to Plan a Premium Outdoor Renovation
Layout, drainage, access, materials, sequencing and budget, explained plainly.
10 June 2026
Driveways in Derby and Nottingham: the first thing anyone sees, and the part that takes the most weight.
32
Google reviews
Every one of them five stars
100+
Projects completed
Across the East Midlands
Under 12 hours
To a written quote
From the end of the site visit
One
Named contact
First visit to last day
Tell us the basics below and we will ring you back in under 12 hours to talk through the site before arranging a visit.
We have received your enquiry and will be in touch shortly.
Driveways done properly, in the order it actually happens.
150mm to 200mm of MOT Type 1 depending on the ground we find, compacted in 75mm layers.
Falls take water to a permeable area or drainage channel, which is often a planning requirement too.
Haunched concrete on every edge, so the pattern cannot creep outward over time.
Parking, turning and access, worked out before the first layer goes down.
“They went above and beyond to give us what we wanted, even when changing our mind at the last minute… now have a lovely garden our little girl can play in.”
Brad B. · Garden landscaping, Google review
“Alex & the team did a fantastic job in completely transforming my garden from soil & rubbish to a gorgeous, slabbed & grassed area for my family to enjoy.”
Kelsey S. · Garden transformation, Google review
“Kept us in the loop on decisions, pointed out problems as they arose and came up with plans and options to fix them. Most importantly the end result looks great and I’m confident it’ll last.”
Howard P. · Derby, Google review
We excavate deeper than a patio and build back up in layers. A domestic driveway gets 150mm to 200mm of MOT Type 1 depending on the ground we find, compacted in 75mm layers with a plate or roller sized for the job. Soft spots are dug out rather than bridged over, because a soft spot that is covered becomes a dip in about eighteen months.

Daylight, the finished block paving and slate boundary walls.

The same driveway after dark, with entrance lighting fitted in.

Boundary walls built alongside a driveway, framing the frontage.
Usually not, if surface water drains to a permeable area within your own boundary rather than running onto the road. We design for that as standard and will tell you if your situation is different.
Typically one to two weeks. The groundworks are the long part, not the surfacing.
Each suits different ground, budgets and maintenance appetites. We will give you the honest trade offs rather than steering you to whichever we would rather lay.
We will tell you exactly when, and it depends on the surface. Driving on it too early is the fastest way to undo the work.
That is a council application and we will tell you whether you need one, though the application itself is between you and the local authority.
Derby, Spondon, Ockbrook, Borrowash, Duffield, Little Eaton, Quarndon, Melbourne, Repton, Etwall, Willington, Aston-on-Trent, Nottingham, West Bridgford, Edwalton, Beeston, Bramcote, Ruddington, Keyworth, Hucknall, Long Eaton, Ilkeston.

Layout, drainage, access, materials, sequencing and budget, explained plainly.
10 June 2026

The five most common, and most expensive, mistakes in garden and driveway projects.
20 May 2026

Proportion, restraint, light and honest materials, explained simply.
6 May 2026
Notes from current projects, what we have learned about building in Derbyshire clay, and the odd thing worth looking at. Once a month at most.